# Restock Lead-Time Calculator

> **In one line**: Pinpoint the last day you can reorder without running out — across the long production-plus-ocean-freight lead time.

## When to use

- Planning replenishment for a product shipped by sea
- Avoiding stockouts during the multi-week cross-border pipeline
- Sizing a purchase order so cash isn't tied up in excess stock

## Inputs

| Field | Notes |
|-------|-------|
| Average daily sales | Units sold per day (recent trailing average) |
| Current stock | On-hand and inbound-available units |
| Production lead time | Days to manufacture after the PO is placed |
| Sea-freight transit | Days in ocean transit plus port handling |
| Safety-stock days | Buffer days to absorb demand spikes and delays |

## Outputs

- **Latest reorder date**: the last day to place the PO without a stockout
- **Projected stockout date**: when current stock runs to zero at current velocity
- **Recommended order quantity**: units to cover the next cycle plus safety stock

## Steps

1. Open [https://www.niceggie.com/en/tools/restock-planner](https://www.niceggie.com/en/tools/restock-planner)
2. Enter average daily sales and current stock
3. Add production lead time, sea-freight transit, and safety-stock days
4. Read the latest reorder date and set a calendar reminder ahead of it

!!! tip "Total lead time is the real deadline"
    Your reorder clock is **production + freight + safety stock**, not just shipping. A 30-day build plus 35-day ocean transit plus a 14-day buffer means you must reorder roughly **79 days of stock** before you hit zero — miss that window and no expediting fully recovers it.

## FAQ

??? question "What if my daily sales are seasonal or trending up?"
    Use a forward-looking estimate rather than a flat trailing average for fast-growing or seasonal SKUs. Re-run the calculator whenever velocity shifts, and lean on a larger safety-stock buffer when demand is volatile.

??? question "Should I include air freight as a fallback?"
    The calculator models the sea-freight cycle. If you miss the reorder window, air freight can bridge the gap at higher cost — treat it as emergency recovery, not a planning baseline.